BIM Ready models

BIM Ready models
WE CAN CONVERT THE POINT CLOUD INTO A BIM READY FORMAT, REVIT, AECOSIM AND ARCHICAD MODELS

BIM stands for – building information modelling – in addition to 3D CAD model being a spatial representation of an object, BIM models add certain information, one could call a database. Each element is defined (walls, windows, floors etc.), and the model is a parametric result combining all of those elements. 2D plans, sections and elevations can be generated automatically from any defined position or direction.

BIM models may also contain other than structural elements – mechanical, electrical, plumbing installations, etc. commonly referred to as MEP.
Exchanging data between BIM formats proved to be changeling and it could cause some problems, We can create native BIM models in two leading formats, namely Revit (from AutoDesk) and AECOSim (from Bentley Systems).
Same as on the ‘standard’ models deciding on the level of detail is crucial.
While the BIM process in its conception was a tool for new construction, as we are all aware a significant percentage of projects are concerned with the redevelopment of existing building stock. Throughout the life cycle of a project 3D laser scanning becomes a key application. The foundation of any BIM process is the data that the design will be built upon. An appropriate scan to BIM model will provide the basis of this foundation.

At Topomaster we are highly experienced in the collection and processing of accurate point cloud data. 3D parametric models can be produced directly from the point cloud, typically in Revit format, however, if required, we can deliver the models in Bentley

Based on the model 2D sheets can be produced at any specified location for plans, sections or elevations. It should be noted that these sheets will not produce the same level of information as would normally be supplied on a typical 2D survey, however, should it be required, we can enhance this information manually if specified at the outset.

As with any survey data, the specification is all important. In the BIM environment, due to an almost infinite number of variables available, this becomes critical. We will work with our clients to define specification at the outset. Due to the collaborative nature of the BIM process, it may be necessary to consult a number of key stakeholders within the project before producing a definitive specification.

THINGS TO CONSIDER:

LOD (Level of Detail) How many details do you need in the model? Think about what the plan for the building is. You may need high detail level on a retained facade, for example, but low detail level on internal partitioning if all you require is to quantify the volume that will be removed.

LOI (Level of Information) How much intelligence do you need from the modelled elements? Be aware that in an existing structure the surveyor may be unable to access all fragments of the building, and will not have an in-depth knowledge within all related disciplines. Discuss any possible limitations at the outset.

Which coordinate system will be used? This is often overlooked but can be critical. Decide at the outset, protect it on site, ensure that all stakeholders are aware of it, and use it.
Basepoint of the model. Again, often overlooked but difficult to change later. Decide on a location and ensure that all stakeholders are aware of it. This will make a federation of models from the various disciplines much easier if its consistent from day one. BIM is a collaborative process. To gain the maximum benefit of it, in terms of time and cost savings, just as with any other building, it is important to start on firm foundations.